After weeks of work off site, at last the on-site construction of the frame begins. As always, the weather intervenes and after weeks of almost no rain the construction starts in a downpour!
On the 11th November the second round started, this time without the rain but with high winds. This didn't stop the team and all of the main timbers are in now place. The main floor joist are in, allowing easier access to the first floor and one can now get a much better picture of the finished room sizes.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|